By using this site, you agree to the Privacy Policy and Terms of Use.
S1 : E1
TV-14 | 74 min | Aired: 03.18.04
Susan works the case of a missing teenager who is presumed dead, whilst Luke has to get into the head of a killer who seems to have pulled off the perfect crime.
The Critical Path
S1 : E1 | TV-14 | 74 min | Aired: 03.18.04
Under the Skin
S1 : E2 | TV-14 | 74 min | Aired: 03.25.04
Luke is fascinated by a skull found at a construction site, but the mystery behind the skull may be more fascinating than its identity.
Happy Families
S1 : E3 | TV-14 | 74 min | Aired: 04.01.04
The discovery of legs at a rubbish dump sends the team in different directions as more and more leads turn up.
Mr. Right
S1 : E4 | TV-14 | 73 min | Aired: 04.08.04
Luke's involvement in his case is so intense it jeopardizes his objectivity, while Susan and Adrian must deal with a prisoner to find a murderer.
Big City, Small World
S1 : E5 | TV-14 | 74 min | Aired: 04.15.04
A drive-by shooting apparently kills a businessman, but the plot thickens when it's found he was murdered in three different ways.
Nothing Sacred
S1 : E6 | TV-14 | 73 min | Aired: 04.22.04
The brutal murder of an art dealer leads Susan and Luke down some mystical paths.
Wives and Lovers
S2 : E1 | TV-14 | 73 min | Aired: 04.05.06
Susan and Luke investigate the death of a woman who appears to have jumped off the roof of a building.
Just Seventeen
S2 : E2 | TV-14 | 71 min | Aired: 04.12.06
Susan investigates the death of a sex offender who was found tied to a tree and shot. Luke investigates the death of a seventeen-year-old who bled to death in the corridors of her school.
Death of a Ladies Man
S2 : E3 | TV-14 | 72 min | Aired: 04.19.06
Susan and Luke investigate a hit-and-run crime that appears deliberate. Meanwhile, DC Alison Bain and DC Frank Craven investigate the shooting of Ryan Everitt.
Game Over
S2 : E4 | TV-14 | 71 min | Aired: 04.26.06
Susan and Luke investigate the murder of Alice Fielding, who was found strangled in her flat.
British police drama that revolves around two mismatched detectives who scour London solving complex cases.
Amanda Donohoe, Kris Marshall
Andy Harries